indico / indico/newdle

Non-equal Timeslots

Open
#425 0 comments 0 reactions 0 assignees View on GitHub
Dominant language
JavaScript
Stars
118
Forks
76
PR merge metrics
No merged PRs in 30d

Description

Hello there,
creating a shift plan for an event, I needed to have timeslots of different lengths. Unfortunately this is not possible. Is there a reason for this limitation?
Thanks!

Contributor guide

No contributing guide indexed for this repository

Research direction

The issue names no files, tests, or entry points. Begin by locating where event timeslots are created, validated, and displayed, then determine how variable lengths should affect scheduling. Done means event plans can contain different timeslot lengths without breaking existing scheduling behavior, with tests covering the new cases.

Written by the indexing model from the issue text.

Assessment

Tech stack
javascript
Domain
web-dev
Issue type
Feature
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.