hiero-ledger / hiero-ledger/hiero-consensus-node

Block Streams Operational Readiness

Open
#24,384 0 comments 0 reactions 0 assignees View on GitHub
Epic
Dominant language
Java
Stars
406
Forks
226
Avg merge
3d 4h
Merged PRs (30d)
210

Description

### Background

TBD

### Acceptance Criteria

TBD

### Dependencies

_No response_

### Definition of Ready (DoR) Checklist

- [ ] Clear acceptance criteria
- [ ] Clear and detailed description
- [ ] Dependencies identified
- [ ] Links to documentation
- [ ] Should be completable in 2-3 Days
- [ ] Initial draft of Low-level design document
- [ ] At least high level test plan
- [ ] Groomed/Estimated

### Definition of Done (DoD) Checklist

- [ ] Acceptance Criteria complete
- [ ] No Codacy issues greater than minor (in new code)
- [ ] JavaDocs updated/created
- [ ] Code commented
- [ ] Unit tests created/updated
- [ ] 80% test code coverage (in new code)
- [ ] Happy Path and major negative cases in HAPI tests as applicable

Contributor guide

Open the contributing guide

Research direction

No source files, tests, entry points, or concrete acceptance criteria are identified. First, define the operational-readiness scope, dependencies, low-level design, and test plan; the work is done only when those criteria and the listed readiness checks are complete.

Written by the indexing model from the issue text.

Assessment

Tech stack
java
Domain
distributed-systems
Issue type
Feature
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
10/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.