hiero-ledger / hiero-ledger/hiero-consensus-node
LineTopology
Open
Otter
- Dominant language
- Java
- Stars
- 406
- Forks
- 226
- Avg merge
- 3d 4h
- Merged PRs (30d)
- 210
Description
Implement a topology where nodes are connected in a linear sequence. This is useful for creating scenarios in which a clear message propagation order and delays are required.
Contributor guide
Research direction
The issue names no files, tests, or entry points. Start by locating the topology abstraction and existing topology implementations, then identify how message order and delays are tested; done means a linear node sequence with deterministic propagation order and configurable delays.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- java
- Domain
- distributed-systems, networking
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 45/100