hackforla / hackforla/tdm-calculator
Handover control of the production FAQ to stakeholder
- Dominant language
- JavaScript
- Stars
- 68
- Forks
- 47
- Avg merge
- 3d 9h
- Merged PRs (30d)
- 25
Description
### Dependency
- [ ] When all the [issues labeled FAQ Database](https://github.com/hackforla/tdm-calculator/issues?q=is%3Aissue%20state%3Aopen%20%22FAQ%20Database%3A%22): are resolved, go to the https://github.com/hackforla/tdm-calculator/issues/2379 and see if we can close it out
- [x] https://github.com/hackforla/tdm-calculator/issues/2427
### Overview
We need to handover control of the production FAQ to stakeholder so that they are responsible for populating and maintaining its content.
### Action Items
- [ ] Find the documentation written by stakeholder with Qs and As
- [ ] Review the existing prod FAQ to see if the language is the same
- [ ] Review with product and dev. Update if needed based on feedback
- [ ] If its the same, confirm with dev that it's ready for handover
- [ ] Once finalized, add before and after images to the [staging deck on this slide]()
- [ ] if no slide has been made, make one in [the staging deck](https://docs.google.com/presentation/d/1crZ3IxqA4hAu3qzD7ns93Ieuqjwh6wyEtuX_46cP-fg)
- [ ] Handover by moving staging slide to next stakeholder presentation deck
- [ ] Get Stakeholder sign-off via the stakeholder meeting slide deck.
### Resources/Instructions
- [Prod FAQ](https://tdm.ladot.lacity.org/faqs)
- #888
#### Slides
- [Staging Deck](https://docs.google.com/presentation/d/1crZ3IxqA4hAu3qzD7ns93Ieuqjwh6wyEtuX_46cP-fg)
- [Staging Deck, slide 2197](https://docs.google.com/presentation/d/1crZ3IxqA4hAu3qzD7ns93Ieuqjwh6wyEtuX_46cP-fg/edit?slide=id.g33594183b81_4_141#slide=id.g33594183b81_4_141)
- Release Deck
- [YYYY-MM-DD Release Deck, slide 2197]
Contributor guide
Research direction
Start by locating the stakeholder’s Q&A documentation and comparing it with the Prod FAQ at tdm.ladot.lacity.org/faqs. Review differences with product and dev, then update or confirm the FAQ is ready. Document before-and-after images on staging deck slide 2197, move the slide to the stakeholder presentation, and obtain stakeholder sign-off.
Written by the indexing model from the issue text.
Assessment
- Domain
- content, documentation
- Issue type
- Documentation
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 25/100