forcedotcom / forcedotcom/devops-center-feedback
Reconnecting an Environment when there is a pending Promotion (Sandbox refresh)
- Dominant language
- No language data
- Stars
- 61
- Forks
- 2
- PR merge metrics
- No merged PRs in 30d
Description
**Describe the bug**
We had a pipeline set up in DevOps with all the environments. We have then refreshed our full sandbox and renamed it to Validation but the pipeline URL was still set up to the previous sandbox URL. We had promoted changes to UAT and then we were trying to promote changes to the Validation sandbox but it failed because the Validation Sandbox wasn't connected to the Pipeline. Is there any way we can deactivate the existing pipeline that has pending deployments and create a new one.
**To Reproduce**
Steps to reproduce the behavior:
1. Deactivate existing pipeline
2. Connect the validation sandbox to the pipeline
**Expected behavior**
Connect Validation Sandbox to the Pipeline
**Screenshots**


Contributor guide
Assessment
This issue has not been assessed yet.