eclipse-score / eclipse-score/score
Feature Requirements Inspection - Lifecycle
- Dominant language
- Starlark
- Stars
- 109
- Forks
- 105
- Avg merge
- 1d 9h
- Merged PRs (30d)
- 24
Description
### What
This issue tracks the formal Feature Requirements Inspection for the feature specified above, according to the S-CORE process.
The inspection validates that the feature's requirements meet quality, completeness, and testability criteria before the work product is marked as `valid(inspected)`.
References:
- [S-CORE Inspection Conduct](https://eclipse-score.github.io/process_description/main/general_concepts/score_review_concept.html#inspection-conduct)
- [Inspection Checklist Template](https://eclipse-score.github.io/module_template/main/score/component_example/docs/requirements/chklst_req_inspection.html)
### Acceptance Criteria (DoD)
- [ ] Feature Requirements in valid(inspected) state
- [ ] Inspection Checklist filled and merged
### How
#### Moderator (Safety Manager)
- [ ] Create the inspection PR in `eclipse-score/score` with the inspection checklist and link it to this issue via `Fixes #` in the PR description
- [ ] Assign Reviewer(s) and Test Expert; communicate scope and deadline
- [ ] Incorporate reviewer findings as commits into the inspection PR
- [ ] Ensure all checklist items are documented with pass/fail verdicts
- [ ] After all reviewers approve, merge the PR
- [ ] Set work product status to `valid(inspected)`
#### Reviewer(s)
- [ ] Review all component requirements against each inspection checklist item
- [ ] For each failing item, open a GitHub issue in `eclipse-score/score` to track the required correction; link it in the PR comment
- [ ] Add findings as PR comments (pass or fail, with rationale and link to correction issue where applicable)
- [ ] Set PR to "Request Changes" if findings exist
- [ ] Re-review after the author addresses findings; update verdict accordingly
#### Test Expert
- [ ] Review requirements from a testability perspective (focus: REQ_08_01 checklist item)
- [ ] Verify that test cases can be derived from each requirement and that verification criteria are clear
- [ ] Add testability findings as PR comments
- [ ] Re-review after author addresses findings; update verdict accordingly
#### Content Responsible (Author)
- [ ] Analyze all findings and linked correction issues documented in the PR
- [ ] Respond to each finding with an explanation or a proposed correction
- [ ] Commit corrections to address all findings
- [ ] Request re-review from the Reviewer(s) and Test Expert
- [ ] Address any follow-up comments until all reviewers approve
> **Note:** Eclipse contributors cannot push to the inspection branch directly. Findings must be added as PR comments; the Moderator incorporates them as commits.
Contributor guide
No contributing guide indexed for this repository
Research direction
Start with the linked S-CORE Inspection Conduct and Inspection Checklist Template, then review the feature requirements in the inspection PR in eclipse-score/score. Done means the checklist is filled and merged, all findings are addressed, and the feature requirements reach valid(inspected) status.
Written by the indexing model from the issue text.
Assessment
- Domain
- documentation
- Issue type
- Documentation
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Quiet
- Clarity
- Mostly clear
- Newbie friendliness
- 35/100