eclipse-score / eclipse-score/score
Enable Hard-Fail Governance After Benchmark Gate
- Dominant language
- Starlark
- Stars
- 109
- Forks
- 105
- Avg merge
- 1d 9h
- Merged PRs (30d)
- 24
Description
## Goal
Switch from rollout mode to enforced governance once benchmark criteria are met.
## Why
Hard-fail enforcement must be tied to measurable readiness, not calendar-based pressure.
## Preconditions
- Benchmark suite running on defined cadence.
- Approved KPI thresholds for Lane A (mandatory path).
- Waiver governance process active and auditable.
## Tasks
- Define required benchmark pass conditions and confidence window.
- Enable required status checks in protected branches.
- Freeze approved toolchain/agent versions for the cycle.
- Define controlled upgrade process and requalification trigger.
- Define rollback trigger if KPI health degrades after cutover.
## Governance Rule
Merge decisions for hard-fail mode are derived from Lane A policy results. Optional accelerator lanes cannot override Lane A deny decisions.
## Done When
- Hard-fail checks are mandatory in target repos.
- Upgrade/requalification process is documented and active.
- Post-cutover monitoring is active with rollback criteria.
Parent: eclipse-score/score#2852
Contributor guide
No contributing guide indexed for this repository
Assessment
This issue has not been assessed yet.