[24/44] Enable TS strict mode in dot-rules
Nobody has claimed this yet.
- Dominant language
- Java
- Stars
- 970
- Forks
- 486
- Avg merge
- 3d 33m
- Merged PRs (30d)
- 170
Description
Description
Part of the strict-mode rollout epic #35932. Enable TypeScript strict mode for the dot-rules project using typescript-strict-plugin.
- Dependency layer: 6 (0 = leaf library, 10 = top-level app)
- Internal dependents: 2 project(s)
- Rollout order: 24 / 44
All internal dependencies of dot-rules should already be in strict mode before starting (they appear earlier in the rollout order).
Acceptance Criteria
-
dot-rules'ssrcis added to thetypescript-strict-pluginstrictpathsconfig. - All resulting type errors are resolved (no new
any; use explicit types). -
// @ts-strict-ignoreis used only where unavoidable, each with a follow-up TODO. -
yarn nx run dot-rules:lintpasses (and:build/:testwhere applicable). -
npx tsc-strictpasses fordot-rules. -
yarn nx affected -t builddoes not break dependents.
Priority
Medium
Additional Context
One project in the bottom-up rollout tracked by epic #35932. Depends on the bootstrap task being merged and on lower-layer projects already being strict.
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating the TypeScript strict paths configuration and the dot-rules project's src entry. Add dot-rules to the strict paths, run npx tsc-strict, and resolve the reported errors without new any types. Verify with yarn nx run dot-rules:lint, applicable build and test targets, and yarn nx affected -t build; any unavoidable ignores need follow-up TODOs.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- build-system, tooling
- Issue type
- Refactor
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Active
- Clarity
- Mostly clear
- Newbie friendliness
- 50/100