[FEAT] 🟣 Phase 7: Cleanup (Weeks 17-18)
Nobody has claimed this yet.
- Dominant language
- Java
- Stars
- 970
- Forks
- 486
- Avg merge
- 3d 33m
- Merged PRs (30d)
- 170
Description
Description
Goal: Remove legacy code and decommission 1.0 infrastructure
Timeline: 2 weeks
Business Impact: Cost savings realized
Status: 📋 Planned
Desired Outcome
Business Outcome:
dotCMS operates on a clean, modern OpenSearch 3.x infrastructure with reduced operational costs, improved maintainability, and eliminated technical debt from the migration, while customers continue to experience reliable search functionality on the new supported platform.
Technical Outcome:
All legacy code (ES7ClientToOpenSearch1Adapter, OSClientToOpenSearch1Adapter, feature flags, dual-write logic) removed from codebase, OpenSearch 1.0 infrastructure safely decommissioned with final backup retained, and OpenSearch 3.x running as sole production cluster with clean architecture and comprehensive documentation.
Target Personas
- Developer teams
- Content teams
- DevOps teams
- System administrators (dotCMS)
Links
No response
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by inventorying the named ES7ClientToOpenSearch1Adapter, OSClientToOpenSearch1Adapter, feature flags, dual-write logic, and OpenSearch infrastructure configuration. The issue provides no files or tests, so first identify the affected code and deployment entry points; done means the legacy components are removed, OpenSearch 1.0 is safely decommissioned with a final backup, OpenSearch 3.x is the sole production cluster, and documentation is complete.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- java
- Domain
- infrastructure, search
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Quiet
- Clarity
- Needs clarification
- Newbie friendliness
- 30/100