dlumbrer / dlumbrer/kbn_network
kbn_network ELK 7.7.0 support
- Dominant language
- JavaScript
- Stars
- 366
- Forks
- 94
- PR merge metrics
- No merged PRs in 30d
Description
After upgrade kibana version 7.7.0 we are having problem with the given error messages. It seems one of visiualization library has been removed from Kibana.
Jun 15 16:51:20 ismlakbnlx03 kibana: {"type":"log","@timestamp":"2020-06-15T13:51:20Z","tags":["info","plugins","siem"],"pid":122413,"message":"Stopping plugin"}
Jun 15 16:51:20 ismlakbnlx03 kibana: FATAL Error: Optimizations failure.
Jun 15 16:51:20 ismlakbnlx03 kibana: 7147 modules
Jun 15 16:51:20 ismlakbnlx03 kibana: #033[1m#033[31mERROR in ./plugins/network_vis/public/network_vis.js
Jun 15 16:51:20 ismlakbnlx03 kibana: Module not found: Error: Can't resolve 'ui/vis/editors/default/schemas' in '/usr/share/kibana/plugins/network_vis/public'#033[39m#033[22m
Jun 15 16:51:20 ismlakbnlx03 kibana: #033[1m#033[31mERROR in ./plugins/network_vis/public/network_vis.js
Jun 15 16:51:20 ismlakbnlx03 kibana: Module not found: Error: Can't resolve 'ui/vis/vis_types/angular_vis_type' in '/usr/share/kibana/plugins/network_vis/public'#033[39m#033[22m
Jun 15 16:51:22 ismlakbnlx03 systemd: kibana.service: main process exited, code=exited, status=1/FAILURE
Jun 15 16:51:22 ismlakbnlx03 systemd: Unit kibana.service entered failed state.
Jun 15 16:51:22 ismlakbnlx03 systemd: kibana.service failed.
Jun 15 16:51:25 ismlakbnlx03 systemd: kibana.service holdoff time over, scheduling restart.
Contributor guide
No contributing guide indexed for this repository
Research direction
Start in plugins/network_vis/public/network_vis.js and inspect the imports for ui/vis/editors/default/schemas and ui/vis/vis_types/angular_vis_type. Reproduce the Kibana 7.7.0 build failure, then verify that the network visualization plugin builds and Kibana starts without these missing-module errors.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- elasticsearch, javascript
- Domain
- data-visualization, frontend
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 32/100