ASIS CTF Finals 2020 Izzy team M4jOr.ZerO
Open
- Dominant language
- No language data
- Stars
- 9
- Forks
- 7
- PR merge metrics
- PR metrics pending
Description
Contributor guide
No contributing guide indexed for this repository
Research direction
Start by opening the linked page and the original writeup for the Izzy challenge to understand the intended content. Then inspect the repository’s existing write-up organization and conventions; done means the ASIS CTF Finals 2020 Izzy M4jOr.ZerO write-up is represented in the expected format and location.
Written by the indexing model from the issue text.
Assessment
- Domain
- documentation, reverse-engineering
- Issue type
- Documentation
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100