codrsquad / codrsquad/portable-python
provide post-build hook capability prior to creating .tar.gz
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 86
- Forks
- 13
- PR merge metrics
- No merged PRs in 30d
Description
There are several cases I can imagine for this. In my case, I have a very common one.
We have the well-known issue where the bundled urllib leverages the bundled openssl which comes with no certificate file, and thus cannot verify any certificates out of the box.
With a post-build hook, we could export a cacert.pem file from the system or from another location and bundle it with the .tar.gz. That would also require us patching some source somewhere to instruct the bundled openssl to use it. There are a few options for that part.
Obviously, we can un-tar, modify, and re-tar, but I don't want to do that.
Another common case I can imagine would be to do pip install of some extra packages prior to bundling (I'm not sure if that can actually work or not, but I believe so.).
Alternatively, if you'd prefer to provide some first-class mechanism for solving the "lack of a bundled cacert" problem, that would help us with the immediate issue so that would be great as well.
Anyway, feedback welcome.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
The issue names no files, tests, or build entry points. Start by locating the build step that creates the .tar.gz and reviewing how bundled files and packages are assembled. Done means a documented post-build stage can modify the bundle before archiving, with a tested path for adding files such as cacert.pem.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- build-system
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100