MVP build tracker — dependency-ordered plan
Nobody has claimed this yet.
- Dominant language
- No language data
- Stars
- 0
- Forks
- 0
- Avg merge
- 8h 21m
- Merged PRs (30d)
- 2
Description
Single view of the build. Governing spec: docs/superpowers/specs/2026-08-22-farewright-mvp-design.md. Foundation plan: docs/superpowers/plans/2026-08-22-contract-core-foundation.md. Each issue lands through a linked PR with tests/evidence; review gates are hard stops.
Milestone 0 — Human accounts & M0-F spike (parallel track)
- #2 Provision external demo accounts (human-only — founder)
- #4 Throwaway remote MCP host/auth feasibility slice
- #5 Record observed auth, client-registration, monitoring, and browser-link rulings
Milestone 1 — Contracts & core foundation (dependency order)
- #3 Repository, CI, templates, branch/review enforcement
- #6 Apply merged-spec and blocking-audit rulings
- #7 Domain event/command/state/projection/money contract
- #8 Supplier/search-result/policy-evaluation contract
- #9 Threat model + external-effect failure matrix
- #10 GATE: independent complete M0-C review — waits for #6/#7/#8/#9 and relevant #5 rulings
- #11 Event log + real projectors/rebuild
- #12 Atomic command receipts/idempotency/effect planning
- #13 Transactional state enforcement + action/payment-level USD ledger
Milestones 2–5 (open after #10; issue dependencies still apply)
2 — Vault & effects: #15 waits for #11; #14 waits for #11/#12. They may proceed in parallel against reviewed redaction/effect interfaces.
3 — MCP surface, setup skill & supplier stubs: #16 waits for #11/#12/#15; #18 waits for #13/#14 → #17 setup skill after #16/#18
4 — Auth & payments: #19 OAuth/RBAC/revocation → #20 approval pages and #21 Stripe lifecycle → #22 GATE: security/effects review
5 — Service loop & consoles: #23 service loop → #24 property console; #25 observability/SSE → #26 redaction proof + claim integrity
Milestone 6 — Integration, deploy & demo readiness
- #27 Duffel adapter + effect reconciliation
- #28 Monitoring Path A only as proven in #5; Path B always available
- #29 Director: clock, disruption injection, labeled fixture fallback
- #30 Railway staging/demo profiles, health and secret checks
- #31 Live-test plus honest outage/fallback rehearsals
- #34 Private reliability matrix + phase-seed index (QA-only; never input steering)
- #32 Cold-user rehearsals with user-chosen inputs and no-match/refusal accepted
- #33 GATE: independent demo-integrity review
Standing rules
- The implementing and adversarial-review models are independent for each revision; roles are not assigned permanently by model name.
- GitHub issues/milestones/PRs/CI are the durable execution record; a Project board is optional.
- Secrets remain founder-only in provider dashboards or local secret storage, never issues/code/model context.
- The trip-operating human is called user in product-facing contexts and traveler in domain contexts; meeting-audience labels never become implementation identifiers or test personas.
- The agent interprets, ranks, recommends, and selects; Farewright stores the graph, evaluates confirmed typed hard rules, and revalidates/enforces them at execution.
- Search returns provider-completeness outcomes and candidate-local policy evidence, never authority or a Farewright recommendation.
- The user chooses the route, dates, USD budget, threshold, required constraints, soft preferences, and selections. Honest no-match, prohibition/refusal, and unavailable outcomes are valid.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with docs/superpowers/specs/2026-08-22-farewright-mvp-design.md and docs/superpowers/plans/2026-08-22-contract-core-foundation.md, then follow the numbered issue dependencies in this tracker. The work is complete when the listed milestones, linked PRs, tests or evidence, and review gates are resolved.
Written by the indexing model from the issue text.
Assessment
- Domain
- build-system
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Active
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100