buildingSMART / buildingSMART/IFC4.x-development
Apply the IfcRelAssignsToProcess relationship to represent connection with IfcTask and IfcCostItem
Open
allocated
allocated-cost
allocated-sequence
ifc-update-out
- Dominant language
- Python
- Stars
- 234
- Forks
- 123
- Avg merge
- 15h 4m
- Merged PRs (30d)
- 5
Description
IfcRelAssignsToProcess could be applied to represent the connection between IfcTask and IfcCostItem. When the IFC file contains IfcCostSchedule, the cost attached to IfcTask could be inferred from IfcCostItem connected to IfcTask. Enrich IfcTask documentation with this use case explanation.
Contributor guide
Assessment
This issue has not been assessed yet.