buildingSMART / buildingSMART/IFC4.x-development

Resource Cost concept incorrectly parametrized

Open
#114 3 comments 0 reactions 0 assignees View on GitHub
allocated allocated-core allocated-cost ifc-update-out
Dominant language
Python
Stars
234
Forks
123
Avg merge
15h 4m
Merged PRs (30d)
5

Description

IfcAppliedValueSelect no longer contains IfcMonetaryMeasure [0]

However all the existing parametrizations of the concept reference IfcMonetaryMeasure as the applied value. E.g. [1]

![afbeelding](https://user-images.githubusercontent.com/1096535/147247854-f114c1a6-520e-45c7-a375-cc557b31f46a.png)

[0] https://standards.buildingsmart.org/IFC/DEV/IFC4_3/RC4-voting/HTML/link/ifcappliedvalueselect.htm

[1] https://standards.buildingsmart.org/IFC/DEV/IFC4_3/RC4-voting/HTML/link/ifcconstructionequipmentresource.htm

Contributor guide

Open the contributing guide

Research direction

Start with the linked IfcAppliedValueSelect definition and the IfcConstructionEquipmentResource example in the IFC4.3 RC4-voting specification. Inspect the existing Resource Cost parametrizations and compare their applied-value references with the current definition. Done means the parametrizations consistently reflect the current specification.

Written by the indexing model from the issue text.

Assessment

Domain
documentation
Issue type
Bug
Difficulty
3/5
Estimated time
1-2 days
Activity status
Stale
Clarity
Mostly clear
Newbie friendliness
35/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.