buildingSMART / buildingSMART/IFC4.x-development
Resource Cost concept incorrectly parametrized
- Dominant language
- Python
- Stars
- 234
- Forks
- 123
- Avg merge
- 15h 4m
- Merged PRs (30d)
- 5
Description
IfcAppliedValueSelect no longer contains IfcMonetaryMeasure [0]
However all the existing parametrizations of the concept reference IfcMonetaryMeasure as the applied value. E.g. [1]

[0] https://standards.buildingsmart.org/IFC/DEV/IFC4_3/RC4-voting/HTML/link/ifcappliedvalueselect.htm
[1] https://standards.buildingsmart.org/IFC/DEV/IFC4_3/RC4-voting/HTML/link/ifcconstructionequipmentresource.htm
Contributor guide
Research direction
Start with the linked IfcAppliedValueSelect definition and the IfcConstructionEquipmentResource example in the IFC4.3 RC4-voting specification. Inspect the existing Resource Cost parametrizations and compare their applied-value references with the current definition. Done means the parametrizations consistently reflect the current specification.
Written by the indexing model from the issue text.
Assessment
- Domain
- documentation
- Issue type
- Bug
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 35/100