buildingSMART / buildingSMART/IFC4.x-development
Bridge is in core layer in IFC, should it be?
Open
affects-uml
after-NWI
allocated-core
decided
- Dominant language
- Python
- Stars
- 234
- Forks
- 123
- Avg merge
- 15h 4m
- Merged PRs (30d)
- 5
Description
[Original post](https://forums.buildingsmart.org/t/ifc4-3-rc2-domain-layer/3164)
In IFC4.3 RC2, Rail, Road, Ports and Waterways, and Tunnel are defined in the Domain Layer of IFC Architecture, while Bridge is defined in the Core Layer. So how was this considered and will this be adjusted in next IFC version?
I wasn't able to verify this, can someone check?
Contributor guide
Assessment
This issue has not been assessed yet.