Allow lab to pick which lane a pool goes into on Prepare Sequencing Run page
Open
feature request
priority:high
scope:small
- Dominant language
- Python
- Stars
- 2
- Forks
- 15
- PR merge metrics
- No merged PRs in 30d
Description
Currently lab sometimes prepares sample sheets one lane at a time. Continuing to support this workflow would require ability to pick a specific lane for a particular pool rather than having the pools be assigned to the lanes in order of addition (so that first pool added is ALWAYS in lane 1, and there can't be a pool in lane 2 unless 2 pools--or two of the same pool--are added).
Raised in shotgun walkthrough 07/31/2018
Contributor guide
No contributing guide indexed for this repository
Assessment
This issue has not been assessed yet.