bcgov / bcgov/Mines-Data-Platform
Verify if there are any additional protocols required
- Dominant language
- HCL
- Stars
- 0
- Forks
- 1
- Avg merge
- 24m
- Merged PRs (30d)
- 1
Description
Feature #57
Description:
Acceptance Criteria:
Other Considerations:
**Definition of Ready:**
- [ ] The story is clearly written and explains Who needs What and Why.
- [ ] Acceptance criteria is clearly specified and understood by the team.
- [ ] The team has discussed and agreed upon how much story points /effort the story will require.
- [ ] There are no external dependencies preventing work on the story.
- [ ] All necessary design elements are completed and reviewed by the team.
- [ ] The technical approach has been reviewed, and any major technical risks or uncertainties have been addressed.
- [ ] The story size as small and efficient in size and can be done within a sprint
Contributor guide
No contributing guide indexed for this repository
Research direction
Start by reading Feature #57, which this issue references, and identify the protocols the feature currently assumes. Determine whether any additional protocols are required, then define and agree on acceptance criteria; the work is done when the protocol requirements are documented and approved.
Written by the indexing model from the issue text.
Assessment
- Domain
- backend-api-design
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 20/100