bazelbuild / bazelbuild/continuous-integration

Updating last green commit failing

Open
#1,345 0 comments 0 reactions 0 assignees View on GitHub
Dominant language
Python
Stars
302
Forks
194
Avg merge
1d 19h
Merged PRs (30d)
41

Description

https://buildkite.com/bazel/rules-apple-darwin/builds/5214#f932d707-3282-4e7e-8b7e-a66d89a3447c

Contributor guide

Open the contributing guide

Research direction

Start with the linked Buildkite build 5214 and identify the failing step related to updating the last green commit. The issue names no repository file, test, or entry point, so trace the failure through the CI configuration before estimating the change. Done means the last-green-commit update succeeds and the affected CI check passes.

Written by the indexing model from the issue text.

Assessment

Domain
ci-cd
Issue type
Bug
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
15/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.