avniproject / avniproject/uninhibited
Uninhibited Phase 2: Operational Dashboard - Cancelled Visit
Open
- Dominant language
- No language data
- Stars
- 0
- Forks
- 0
- PR merge metrics
- No merged PRs in 30d
Description
- [ ] To be created in Metabase in the Production Environment
- [ ] [Requirement Document](https://docs.google.com/spreadsheets/d/186H_Wv4LS08qKjQBFxKmINe9izSEPyJZdKQrlnRghac/edit?gid=710548602#gid=710548602)
Contributor guide
No contributing guide indexed for this repository
Research direction
Start with the linked Requirement Document to determine the cancelled-visit dashboard's metrics, filters, and presentation, then review the existing Metabase setup in the Production Environment. Done means the specified operational dashboard has been created in Metabase and matches the requirement document.
Written by the indexing model from the issue text.
Assessment
- Domain
- analytics
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 30/100