avniproject / avniproject/uninhibited
[Do in Prod] Uninhibited Phase 2: End of Programme Report
Open
- Dominant language
- No language data
- Stars
- 0
- Forks
- 0
- PR merge metrics
- No merged PRs in 30d
Description
- [ ] Pre-Programme
- [ ] To be developed using production data.
- [ ] [Requirement Link](https://docs.google.com/spreadsheets/d/15gmlRxBRIuXRY5X_GHNkHxtXNFefkdelR-sPTLjYORE/edit?gid=413596397#gid=413596397&range=34:34)
Contributor guide
No contributing guide indexed for this repository
Research direction
Start by reviewing the linked requirement in the Google Sheet and the production-data expectation in the issue. Determine the report's required scope from that material; done means the End of Programme Report is developed against the stated requirements using production data.
Written by the indexing model from the issue text.
Assessment
- Domain
- analytics
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 20/100