athityakumar / athityakumar/dome-project

Cost optimization

Open
#1 0 comments 0 reactions 0 assignees View on GitHub
Dominant language
Ruby
Stars
0
Forks
0
PR merge metrics
No merged PRs in 30d

Description

Currently, the Ruby script optimizes with respect to material (`P`) and dimensions of the Arm (`V`). This should be extended to optimize with respect to total cost of materials as well, ie, via Multi-objective optimization.

Contributor guide

No contributing guide indexed for this repository

Research direction

Start by locating the Ruby script and reading how its current optimization uses material (P) and Arm dimensions (V). Determine the intended total-material-cost objective and how it should participate in the multi-objective optimization. Done means the script accounts for total material cost alongside the existing objectives.

Written by the indexing model from the issue text.

Assessment

Tech stack
ruby
Domain
performance
Issue type
Feature
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.