JMeter Run Duration Exceeds
- Dominant language
- Java
- Stars
- 9.5k
- Forks
- 2.3k
- Avg merge
- 1d 22h
- Merged PRs (30d)
- 5
Description
### Expected behavior
We have configured our script using include controller, and configured the test duration for 1 hour, expected should be completed within 1hour.
### Actual behavior
If include controller is been added in the script the execution is prolonged for more than an hour it actually runs 7 to 8 hours eventhough the run setting is configured for 1hour.
we did another run without include controller, the run went fine completing the targeted samples in 1hr.
Is it possible that due to include controller the run duration will get extended....
### Steps to reproduce the problem
1. Create a script with any site.
2. Add simple controller and save as test fragment.
3. Now add include controller under thread group.
4. configure the test fragment in the include controller.
### JMeter Version
5.6.3
### Java Version
open jdk version 8
### OS Version
Microsoft windows
Contributor guide
Research direction
Reproduce the report on JMeter 5.6.3 with OpenJDK 8 on Windows, comparing a one-hour test with and without an Include Controller and a test fragment. Start by checking the Include Controller and test-duration behavior, then determine whether the extended run is expected or indicates a defect; done means the behavior is explained or a narrowly scoped fix is identified.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- java
- Domain
- testing
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100