a8m / a8m/pb

Using `set_max_refresh_rate` prevents bar from updating, is not defeated by `tick`/`flush`

Aberta
#118 0 comentários 0 reações 0 responsáveis Ver no GitHub
Linguagem predominante
Rust
Estrelas
600
Forks
59
Métricas de merge de PRs
Nenhum PR com merge em 30d

Descrição

In my case, I'd like to set the bar to the exact final total number in case the process doesn't go to completion.
No combination of `set/tick/flush` does get me an updated state when the ProgressBar goes out of scope.

Looks like there's no final redraw upon exiting the thread. At first I though it might be some kind of a race condition, so checked with sleeping the main thread to no avail.

Some possible solutions in order of preference:
- Make `flush` or `tick` ignore the refresh rate.
- Expose a manual `redraw`.
- Add a `finish_with(final: u64)` - not ideal, as the `ProgressBar.count` is not public (why?), which means a duplicating variable is necessary on user's side.

Guia de contribuição

Nenhum guia de contribuição indexado para este repositório

Avaliação

Esta issue ainda não foi avaliada.

Receba novas issues na sua caixa de entrada

Um resumo curto de issues do GitHub para quem está começando.