VisActor / VisActor/VTable

[Feature] 希望甘特图任务条能上下拖动,把其中一行的数据上下拖动另外一行

Open
#3,519 1 comment 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

feature
Dominant language
TypeScript
Stars
3.7k
Forks
486
Avg merge
1d 19h
Merged PRs (30d)
16

Description

What problem does this feature solve?

如题

What does the proposed API look like?

拖动后返回一个新的结构,数据自动到对应的行内

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

No files, tests, or entry points are named. First clarify the intended Gantt interaction and inspect the existing task-bar drag behavior; the work is done when dragging a task bar vertically moves its data to the corresponding row and returns the updated structure.

Written by the indexing model from the issue text.

Assessment

Tech stack
typescript
Domain
data-visualization
Issue type
Feature
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
30/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.