Sienna-Platform / Sienna-Platform/PowerOperationsModels.jl

Implement G-1 model

Open
#51 0 comments 0 reactions 1 assignee View on GitHub

Nobody has claimed this yet.

  • #1416 by @SebastianManriqueM — closed without merging
  • #1462 by @SebastianManriqueM — closed without merging
  • #1463 by @SebastianManriqueM — closed without merging
enhancement
Dominant language
Julia
Stars
2
Forks
1
Avg merge
1d 16h
Merged PRs (30d)
26

Description

Currently the models for SCUC are built for N - 1 transmission line outages and do not consider generator outages.

There is a need to implement the SC model for generator outages

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Assessment

This issue has not been assessed yet.

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.