RunestoneInteractive / RunestoneInteractive/rs
Adjust assignment visibility dates on copy
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 69
- Forks
- 117
- Avg merge
- 6d 4h
- Merged PRs (30d)
- 24
Description
On copying assignments it would be nice to adjust visibility dates in the same way that due dates are.
See:
https://github.com/RunestoneInteractive/rs/pull/1160#issuecomment-3968495136
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by reading the assignment-copy discussion in the linked pull request, especially the referenced issue comment, then locate the copy flow and its existing due-date adjustment behavior. Done means copied assignments can adjust visibility dates in the same way as due dates, with the relevant checks or tests passing.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- backend
- Issue type
- Feature
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 38/100