Different CH4 pipeline costs that are not 'guesstimates'
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 130
- Forks
- 59
- PR merge metrics
- No merged PRs in 30d
Description
Currently, the CH4 pipeline value comes from a wikipedia article.
It could be updated to the estimates given in this paper https://doi.org/10.1016/j.isci.2021.103495 for different pipeline parameters.
Proposed entries (by @euronion)
- CH4 (g) pipeline mini -> 12 in
- CH4 (g) pipeline small -> 20 in
- CH4 (g) pipeline medium -> 36 in
- CH4 (g) pipeline large -> 48 in
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
No file or test is named. Read the linked paper and inspect the current CH4 pipeline entries in the technology-data repository, then compare their source and parameterization with the proposed 12, 20, 36, and 48 inch sizes. Done means the four pipeline variants use the paper's estimates instead of the Wikipedia-derived values.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- data
- Issue type
- Feature
- Difficulty
- 2/5
- Estimated time
- 1-3 hours
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 52/100