Scale RHS on EV gen and NG trading limit constraints
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 148
- Forks
- 55
- Avg merge
- 2d 11h
- Merged PRs (30d)
- 18
Description
Feature Request
The RHS of the EV generation and Natural Gas import/export limits are quite big and I think (??) leading to some runs giving sub-optimal solutions.
We should scales these values and modify the efficiency of the links to account for this.
Suggested Solution
No response
Additional Info
No response
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
The issue names the EV generation and Natural Gas import/export limit constraints but no files or tests. Start by locating those constraints in the model, then determine how RHS scaling and adjusted link efficiencies affect the optimization; done means the affected runs no longer produce sub-optimal solutions from these values.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- backend
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100