add SMR capacities build between 1990-2020
Open
@toniseibold is already working on this.
Since Jun 20, 2024.
good first issue
- Dominant language
- Python
- Stars
- 50
- Forks
- 32
- Avg merge
- 5d 21h
- Merged PRs (30d)
- 1
Description
Observation:
- SMR capacity stays constant
Explanation:
- lifetime in technology data is 30 years (could cover 2020-2050) and most SMR will probably be built in 2020 -- in 2050 it's probably of no/limited use
- But in real life some SMR would be built in 1990-2020 and we don't take account of this
Fix:
- add SMR capacities built between 1990-2020 and ensure that they are phased out correctly
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Assessment
This issue has not been assessed yet.