coal operating as peak plant and CCGT as baseload in 2020
Nobody has claimed this yet.
- Dominant language
- Python
- Stars
- 50
- Forks
- 32
- Avg merge
- 5d 21h
- Merged PRs (30d)
- 1
Description
When analysing the flexibility provision I found:
So it seems like coal+lignite are operating as flexible peak load provider and CCGT as a base load provider. This is not very realistic.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
The issue provides an image of the 2020 flexibility analysis but names no files, tests, or entry points. Start by locating the code and input data that produce this analysis, then reproduce the coal, lignite, and CCGT dispatch before determining the expected operating behavior with the maintainers. Done requires an agreed correction or explanation of the dispatch result.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- data
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100