Complete costs in the BoM (Bill of Materials) for Hardware-X paper...
Open
@nk25719 is already working on this.
Since Mar 16, 2026.
Hardware-X Paper
- Dominant language
- C++
- Stars
- 8
- Forks
- 6
- PR merge metrics
- No merged PRs in 30d
Description
Dear @nk25719,
The Overleaf paper for Hardware-X has been shared to both you and @ForrestErickson (who has been invited at both his email addresses).
Mairin and I have moved the BoM into the Hardware-X paper as required. However, there are some entries where the cost is listed as "10000000" or something, Lee's signal that it is not complete. We need the actual costs to be placed there, or estimated, and the total cost to actually be summed. The HardwareX paper template requires this.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Assessment
This issue has not been assessed yet.