Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine
[Gantt Chart] - 2.2.4 Wire date marker frontend
Open
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 36
- Forks
- 9
- Avg merge
- 4d 21h
- Merged PRs (30d)
- 11
Description
Description
Add button and connect to endpoints
Acceptance Criteria
TBD
Proposed Solution
TBD
Mocks
No response
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating the Gantt Chart frontend entry point and the endpoints this feature should use; the issue does not name files or endpoint paths. Confirm the button behavior and acceptance criteria with maintainers, then verify that the date marker can trigger the endpoint from the UI.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- api, frontend
- Issue type
- Feature
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Active
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100