Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine
[Gantt Chart] - 2.2.1 Date marker endpoints
Open
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 36
- Forks
- 9
- Avg merge
- 4d 21h
- Merged PRs (30d)
- 11
Description
Description
Build date marker endpoints
Acceptance Criteria
TBD
Proposed Solution
TBD
Mocks
No response
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
The issue names no files, tests, or entry points and leaves both acceptance criteria and the proposed solution as TBD. First clarify the required date marker endpoint behavior and locate the existing Gantt chart API entry points; done means the agreed endpoints are implemented and verified by appropriate tests.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- api, backend
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Active
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100