Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine
[Gantt Chart Timeline] - Set Snap Points to Mondays
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 36
- Forks
- 9
- Avg merge
- 4d 21h
- Merged PRs (30d)
- 11
Description
Current Features
When dragging a new work package around in the timeline, the start date snaps to whatever day of the week you are currently on. However, start dates should only be on Mondays.
Desired Additional Features
Change the snap point so that it aligns on Mondays rather than whatever day you are currently on.
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start at the Gantt Chart Timeline drag behavior described in the issue and trace how the current start-date snap point is calculated. Change the behavior so newly dragged work packages align to Mondays, then verify that dates no longer snap to other weekdays.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- frontend
- Issue type
- Feature
- Difficulty
- 2/5
- Estimated time
- 1-3 hours
- Activity status
- Stale
- Clarity
- Clearly specified
- Newbie friendliness
- 45/100