Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine

[Gantt Chart Timeline] - Set Snap Points to Mondays

Open
#2,689 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

front-end medium
Dominant language
TypeScript
Stars
36
Forks
9
Avg merge
4d 21h
Merged PRs (30d)
11

Description

Current Features

When dragging a new work package around in the timeline, the start date snaps to whatever day of the week you are currently on. However, start dates should only be on Mondays.

Desired Additional Features

Change the snap point so that it aligns on Mondays rather than whatever day you are currently on.

Contributor guide

No contributing guide indexed for this repository

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

Start at the Gantt Chart Timeline drag behavior described in the issue and trace how the current start-date snap point is calculated. Change the behavior so newly dragged work packages align to Mondays, then verify that dates no longer snap to other weekdays.

Written by the indexing model from the issue text.

Assessment

Tech stack
typescript
Domain
frontend
Issue type
Feature
Difficulty
2/5
Estimated time
1-3 hours
Activity status
Stale
Clarity
Clearly specified
Newbie friendliness
45/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.