Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine
[Gantt Chart] - Add New Work Package Button And New Project Button
Nobody has claimed this yet.
- Dominant language
- TypeScript
- Stars
- 36
- Forks
- 9
- Avg merge
- 4d 21h
- Merged PRs (30d)
- 11
Description
Description
We want the ability to create a new work pacakge from the gantt chart with a new work pacakge button at the project level.
Acceptance Criteria
- Button Somewhere on/near the project task bar to add a work package, maybe even just a plus button that creates a modal to fill out similar bare minimum information to create a work package.
Proposed Solution
This is complicated. You will be able to use the auto implementing cr feature to create crs with these projects/ work packages.
Mocks
No response
Contributor guide
No contributing guide indexed for this repository
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
No files, tests, or entry points are named. Start by locating the Gantt chart and the existing project or work package creation flow, then confirm the button placement and minimum modal fields with maintainers. Done means a project-level control opens creation UI and successfully creates a work package.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- typescript
- Domain
- frontend
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100