Northeastern-Electric-Racing / Northeastern-Electric-Racing/FinishLine

[Gantt Chart] - Add New Work Package Button And New Project Button

Open
#2,422 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

difficult front-end
Dominant language
TypeScript
Stars
36
Forks
9
Avg merge
4d 21h
Merged PRs (30d)
11

Description

Description

We want the ability to create a new work pacakge from the gantt chart with a new work pacakge button at the project level.

Acceptance Criteria
  • Button Somewhere on/near the project task bar to add a work package, maybe even just a plus button that creates a modal to fill out similar bare minimum information to create a work package.
Proposed Solution

This is complicated. You will be able to use the auto implementing cr feature to create crs with these projects/ work packages.

Mocks

No response

Contributor guide

No contributing guide indexed for this repository

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

No files, tests, or entry points are named. Start by locating the Gantt chart and the existing project or work package creation flow, then confirm the button placement and minimum modal fields with maintainers. Done means a project-level control opens creation UI and successfully creates a work package.

Written by the indexing model from the issue text.

Assessment

Tech stack
typescript
Domain
frontend
Issue type
Feature
Difficulty
5/5
Estimated time
Over a week
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.