NatLabRockies / NatLabRockies/OpenStudio
Enhance schedule objects
Nobody has claimed this yet.
- Dominant language
- C++
- Stars
- 646
- Forks
- 237
- Avg merge
- 3d 11h
- Merged PRs (30d)
- 10
Description
Schedule:Compact should have something else than setString to add new fields, and have some kind of proper extensible group probably (Through, Until, Value)
Schedule:FixedInterval should have a way to set the behavior for WinterDesignDay and SummerDesignDay at least.
(ScheduleFile should be implemented)
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by locating the Schedule:Compact and Schedule:FixedInterval object implementations and their existing tests or API entry points. Review how fields and WinterDesignDay/SummerDesignDay behavior are currently represented, then investigate the scope of ScheduleFile support. Done requires an agreed design and coverage for the requested schedule extensions.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- cpp
- Domain
- tooling
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100