MetOffice / MetOffice/ProFSea-tool
Update `profsea-climate` baseline period
- Dominant language
- Python
- Stars
- 6
- Forks
- 11
- Avg merge
- 13h 34m
- Merged PRs (30d)
- 2
Description
Currently the baseline period for projections is 1986-2005, as per AR5. This should probably at least be updated to the AR6 baseline period (1996-2014).
A change could also be made to make baseline changes more straight forward, so a user could specific the baseline they want to run with themselves.
Contributor guide
No contributing guide indexed for this repository
Research direction
Start by locating where the profsea-climate baseline period is defined and how projection settings are passed through the tool. Confirm how the current 1986-2005 period is used, then determine what is needed for the AR6 1996-2014 period or a user-selected baseline. Done means the selected baseline is applied consistently to projections.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- python
- Domain
- data
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 35/100