MerginMaps / MerginMaps/mobile
"Small spacing between 'Add field' and 'Create project' Buttons in Create Project UI"
Nobody has claimed this yet.
- Dominant language
- C++
- Stars
- 388
- Forks
- 87
- Avg merge
- 2d 7h
- Merged PRs (30d)
- 20
Description
**Description**
The spacing between the Add and Create buttons is too small when creating a new project and adding more fields. This spacing is visually inconsistent with the rest of the form.
**Environment**
Staging
**Application (+ app version, build, operating system)**
Device/OS: IPhone 14 / iOS 26.1
Device/OS: Samsung Galaxy A53 / Android 15
**Steps to reproduce**
1. Open the app and navigate to Home → Create new project.
2. In the Create Project flow, use the form and click "Add field" to add additional fields (repeat until there are multiple fields).
3. Observe the gap between the "Add field" button and the "Create project" button.
**Actual results**
The spacing between the "Add field" and the "Create project" buttons is to small, when multiple fields are present.
**Expected results**
The "Add field" and "Create project" buttons should be visually grouped with consistent spacing and alignment so the primary and secondary actions read clearly as related controls.
**Screenshot**
Android / iOS
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start by reproducing the Create new project flow on the listed iOS or Android environments, adding multiple fields and comparing the two button positions. Locate the UI entry point for the Add field and Create project controls, then verify that their spacing and alignment are consistent after the change on both platforms.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- android, cpp, ios
- Domain
- mobile
- Issue type
- Bug
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 48/100