GEOS-ESM / GEOS-ESM/GEOSgcm_GridComp

[Audit] WaveWatchGridComp: pre-migration audit

Open
#1,297 0 comments 0 reactions 0 assignees View on GitHub

Nobody has claimed this yet.

mapl3-readiness pre-migration-audit
Dominant language
Fortran
Stars
10
Forks
13
Avg merge
17h 35m
Merged PRs (30d)
14

Description

Component

Name: WaveWatchGridComp
Primary file: GEOSwgcm_GridComp/GEOSwavewatch_GridComp/GEOS_WaveWatchGridComp.F90
Sub-repo: GEOSgcm_GridComp
Effort: S
MAPL depth: depth-1

Current state

  • VERIFY_( calls: 31
  • LOC: 814

Notes

None.

Links

  • Parent epic: GEOS-ESM/GEOSgcm_GridComp#1241

Contributor guide

Open the contributing guide

First steps

  1. Read the whole issue, then the project's contributing guide.
  2. Comment on the issue to say you are picking it up — it saves two people doing the same work.
  3. Fork the repository and make your change on a branch.
  4. Open a pull request that references the issue number.

Research direction

Start with GEOSwgcm_GridComp/GEOSwavewatch_GridComp/GEOS_WaveWatchGridComp.F90 and inspect its 31 VERIFY_ calls. Review the parent epic GEOS-ESM/GEOSgcm_GridComp#1241 for migration context; the issue does not define an audit checklist or completion criteria, so those should be clarified first.

Written by the indexing model from the issue text.

Assessment

Tech stack
fortran
Domain
backend
Issue type
Refactor
Difficulty
3/5
Estimated time
1-2 days
Activity status
Quiet
Clarity
Needs clarification
Newbie friendliness
35/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.