GEOS-ESM / GEOS-ESM/GEOSgcm_GridComp
[Audit] WaveWatchGridComp: pre-migration audit
Open
Nobody has claimed this yet.
mapl3-readiness
pre-migration-audit
- Dominant language
- Fortran
- Stars
- 10
- Forks
- 13
- Avg merge
- 17h 35m
- Merged PRs (30d)
- 14
Description
Component
Name: WaveWatchGridComp
Primary file: GEOSwgcm_GridComp/GEOSwavewatch_GridComp/GEOS_WaveWatchGridComp.F90
Sub-repo: GEOSgcm_GridComp
Effort: S
MAPL depth: depth-1
Current state
VERIFY_(calls: 31- LOC: 814
Notes
None.
Links
- Parent epic: GEOS-ESM/GEOSgcm_GridComp#1241
Contributor guide
First steps
- Read the whole issue, then the project's contributing guide.
- Comment on the issue to say you are picking it up — it saves two people doing the same work.
- Fork the repository and make your change on a branch.
- Open a pull request that references the issue number.
Research direction
Start with GEOSwgcm_GridComp/GEOSwavewatch_GridComp/GEOS_WaveWatchGridComp.F90 and inspect its 31 VERIFY_ calls. Review the parent epic GEOS-ESM/GEOSgcm_GridComp#1241 for migration context; the issue does not define an audit checklist or completion criteria, so those should be clarified first.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- fortran
- Domain
- backend
- Issue type
- Refactor
- Difficulty
- 3/5
- Estimated time
- 1-2 days
- Activity status
- Quiet
- Clarity
- Needs clarification
- Newbie friendliness
- 35/100