Esri / Esri/utility-network-modeling
Three Phase Pump
- Dominant language
- No language data
- Stars
- 20
- Forks
- 1
- PR merge metrics
- No merged PRs in 30d
Description
Pumps are frequently classified as critical infrastructure supported by electricity due to pumps being used for pumping sewage or water in places like New Orleans. Power providers track the location and status of the power being delivered to these facilities and give them an extremely high priority during power restoration efforts. In most cases these types of pumps are three phase either low voltage or medium voltage. Both example needs to be shown. It is important to denote in the examples that there will be an attribute designating the pump as critical infrastructure.
- [ ] Overhead Low Voltage Three Phase Pump
- [ ] Underground Low Voltage Three Phase Pump
- [ ] Overhead Medium Voltage Three Phase Pump
- [ ] Underground Medium Voltage Three Phase Pump
The Overhead Low Voltage Three Phase Pump would consist of following:
- [ ] Overhead Medium Voltage Three Phase line
- [ ] Overhead Three Phase Transformer Bank (including fuses)
- [ ] Low Voltage Overhead Lines
- [ ] Low Voltage Service
- [ ] Low Voltage Three Phase Pump
The Overhead Medium Voltage Three Phase Pump would consist of the following:
- [ ] Overhead Medium Voltage Three Phase line
- [ ] Overhead Cutout Fuses
- [ ] Overhead Service Point/Primary Meter
- [ ] Low Voltage Service
- [ ] Low Voltage Three Phase Pump
The Underground Low Voltage Three Phase Pump would consist of the following:
- [ ] Medium Voltage Underground Three Phase line
- [ ] Medium Voltage Elbows, Fused
- [ ] Medium Voltage Pad Mounted Three Phase Transformer
- [ ] Low Voltage Lines
- [ ] Low Voltage Service Point
- [ ] Low Voltage Pump
The Underground Medium Voltage Three Phase Pump would consist of the following:
- [ ] Medium Voltage Underground Three Phase line
- [ ] Medium Voltage Elbows, Fused
- [ ] Pad Mounted Service Point/Primary Meter
- [ ] Medium Voltage Pump
Contributor guide
Research direction
No files, tests, or entry points are named. Start by locating the utility network model examples and existing pump, line, transformer, fuse, meter, and service definitions; done means adding all four overhead and underground, low- and medium-voltage three-phase pump examples with the critical-infrastructure attribute shown.
Written by the indexing model from the issue text.
Assessment
- Domain
- infrastructure
- Issue type
- Feature
- Difficulty
- 5/5
- Estimated time
- Over a week
- Activity status
- Stale
- Clarity
- Mostly clear
- Newbie friendliness
- 25/100