E3SM-Project / E3SM-Project/scream
Run simulation length seems out of sync between EAMxx and CIME
- Dominant language
- No language data
- Stars
- 79
- Forks
- 54
- PR merge metrics
- No merged PRs in 30d
Description
There appears to be a discrepancy between the length of simulation run reported in the e3sm_timing file vs. the actual length of the run, when running with EAMxx. This was first noticed when looking at PACE results, which always reported a run length that was 1-day short.
It may be related to the fact that EAMxx has 0-based indices rather than 1-based. But it isn't clear if ATM reports nsteps back to CIME, or CIME keeps track some other way.
Making this issue to have a central location for discussion.
Contributor guide
No contributing guide indexed for this repository
Research direction
Start with the e3sm_timing file and trace how EAMxx reports nsteps to CIME, comparing that value with the actual run length observed in the PACE results. Done means the source of the one-day discrepancy is identified and the reported simulation length matches the actual run.
Written by the indexing model from the issue text.
Assessment
- Tech stack
- cpp
- Domain
- hpc
- Issue type
- Bug
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Stale
- Clarity
- Needs clarification
- Newbie friendliness
- 25/100