E3SM-Project / E3SM-Project/scream

Run simulation length seems out of sync between EAMxx and CIME

Open
#1,991 7 comments 0 reactions 0 assignees View on GitHub
bug
Dominant language
No language data
Stars
79
Forks
54
PR merge metrics
No merged PRs in 30d

Description

There appears to be a discrepancy between the length of simulation run reported in the e3sm_timing file vs. the actual length of the run, when running with EAMxx. This was first noticed when looking at PACE results, which always reported a run length that was 1-day short.

It may be related to the fact that EAMxx has 0-based indices rather than 1-based. But it isn't clear if ATM reports nsteps back to CIME, or CIME keeps track some other way.

Making this issue to have a central location for discussion.

Contributor guide

No contributing guide indexed for this repository

Research direction

Start with the e3sm_timing file and trace how EAMxx reports nsteps to CIME, comparing that value with the actual run length observed in the PACE results. Done means the source of the one-day discrepancy is identified and the reported simulation length matches the actual run.

Written by the indexing model from the issue text.

Assessment

Tech stack
cpp
Domain
hpc
Issue type
Bug
Difficulty
4/5
Estimated time
3-5 days
Activity status
Stale
Clarity
Needs clarification
Newbie friendliness
25/100

Get new issues in your inbox

A short digest of beginner-friendly GitHub issues.