ChainSafe / ChainSafe/open-creator-rails
Work Breakdown
- Dominant language
- Solidity
- Stars
- 2
- Forks
- 1
- PR merge metrics
- No merged PRs in 30d
Description
**What**
Break down the proposal/scope, design, and architecture work into epics and issues.
**Why**
Organizing the work into structured epics and issues provides clarity on scope, enables better planning, and ensures all aspects of the proposal are properly tracked and managed throughout the project lifecycle.
**How**
Review the proposal/scope document and design artifacts, then create epics and issues that break down the work into manageable pieces aligned with the architecture and design work.
**Acceptance Criteria**
- All work items from the proposal/scope are represented as epics or issues
- Work items are logically organized and structured
- Epics and issues are properly linked and categorized
- The breakdown reflects the design and architecture work
**Estimation**
**Dependencies**
Depends on #2 (Design core flows and architecture)
**Reference**
[Proposal](https://docs.google.com/document/d/19KXInU-PulVS6OU_p-GdhEIWB376gN0aR2NzWPMKLPc/edit?tab=t.0#heading=h.xczd0a1z9dh3)
Contributor guide
Assessment
This issue has not been assessed yet.