ChainSafe / ChainSafe/canton-extending-mainnet
[P2-E9.3] CI integration
- Dominant language
- Shell
- Stars
- 0
- Forks
- 0
- Avg merge
- 22h 58m
- Merged PRs (30d)
- 1
Description
**Context.** The suites above join the repo's CI with pragmatic sharding and log-gate
hygiene, so flake noise does not erode trust in the signal.
**Deliverable.** CI wiring for the two-sync jobs; canton-log ignore patterns audited for
the new components (version-agnostic patterns — no pinned patch versions); flake
quarantine process documented.
**Acceptance.** Suites run per-PR; a deliberate red fails the gate; one week of runs
with no infra-red requiring manual rerun.
**Depends on.** P2-E9.1, P2-E9.2.
—
Epic: #72 · Plan: [P2-E9-testing.md](https://github.com/ChainSafe/canton-extending-mainnet/blob/main/docs/planning/phase-2-epics/P2-E9-testing.md)
Contributor guide
No contributing guide indexed for this repository
Research direction
Start by reading docs/planning/phase-2-epics/P2-E9-testing.md and the deliverables from P2-E9.1 and P2-E9.2. Then inspect the repository's CI configuration and the two-sync job outputs. Done means per-PR suites, deliberate failures blocking the gate, audited version-agnostic canton-log patterns, documented flake quarantine, and one week without infrastructure reds requiring reruns.
Written by the indexing model from the issue text.
Assessment
- Domain
- ci-cd, testing
- Issue type
- Feature
- Difficulty
- 4/5
- Estimated time
- 3-5 days
- Activity status
- Active
- Clarity
- Mostly clear
- Newbie friendliness
- 48/100